Slow but Steady Progress-2/27/2016

This week has been so busy and stressful, I was not sure we would have any progress to show but I am THRILLED to post this update. I am not including any pictures of the dinning/playroom because with only one coat of paint it looks worse than when we started. Hopefully a second coat will go on Monday and we can get most of it back together as well. I have always said that the hardest part of remodeling is living around it.  So first up Matt designed and built both a shelf for the microwave but also a shelf to hold the Keurig. I LOVE this shelf and it actually not only adds space but let us move the Keurig back to the kitchen from Matt’s office.

image image

image

 

He was also able to finish out the trim for the window and door that faces the living room.

image I know the next couple of weeks will be slow as far as progress goes because a lot of the next steps are adding the plumbing that is needed to move the sink. But we are moving along!

Here is the other post to show just how far we have come.

  1. The Plan
  2. The Wall
  3. The Beam
  4. The Window

One thought on “Slow but Steady Progress-2/27/2016

  1. Pingback: Kitchen Progress-03/03/2016 | Teens Tots and Everything In Between

Leave a Reply

Your email address will not be published. Required fields are marked *